Skip to main content

New Melton Hospital marks one year of major construction

31 Jul 2026 Capital works
It’s now been 12 months since major construction commenced on the new Melton Hospital site, and work is powering ahead with around 350 workers on-site daily.
New Melton Hospital construction site

Structural steel and concrete works are progressing, with more than 53,770 square metres (roughly 3 AFL football fields) of concrete poured so far. More than 473,500 hours of work have been completed on-site, and construction of the Hospital is on track for completion in 2029. 

Read about construction progress, and the four named cranes (including the two named after Western Health staff Mandy Cullen and Eddie Spiteri), in the first edition of the new Melton Hospital project newsletter.

Also watch this short video of ‘then and now’ drone footage to see the hospital structure starting to rise out of the ground:

<svg class="w-[82px] h-[82px] md:w-[104px] md:h-[104px]" width="104" height="104" viewBox="0 0 104 104" fill="none" xmlns="http://www.w3.org/2000/svg"> <rect width="104" height="104" rx="8" fill="black" fill-opacity="0.75"/> <path d="M46 40H52V64H46V40Z M56 40H62V64H56V40Z" fill="white"/> </svg>
In the case of a life threatening emergency, call 000.
Emergency